Santiago Bernabéu
Real Madrid’s ground, fully modernised (retractable roof, retractable pitch), is the Spanish front-runner to host the 2030 final.
Spain · A Coruña
A Coruña pulled out on 16 March 2026: a redevelopment costing more than €100 million and transport problems. Riazor will be modernised, but without the World Cup.
Riazor, home of Deportivo de La Coruña, holds around 32,490, below the FIFA minimum of 40,000 net seats.
On 16 March 2026, the mayor, Inés Rey, the Depor president, Juan Carlos Escotet (Abanca), and the Diputación announced the withdrawal: the redevelopment would have cost more than €100 million. A more modest modernisation of the stadium is going ahead instead. Vigo (Balaídos) has been put forward to replace A Coruña.
Not a host city: no matches scheduled in 2030.
Last checked : 30 August 2026
Real Madrid’s ground, fully modernised (retractable roof, retractable pitch), is the Spanish front-runner to host the 2030 final.
Atlético’s 70,692-seat stadium has already hosted a Champions League final (2019). Its participation in 2030 has been described as “in doubt” by the Spanish press.
Mid-rebuild, the Camp Nou is reopening in stages: 62,652 seats licensed since March 2026, with a target of 104,600 covered seats by late 2027 – early 2028.